ALUPOLA MINIHYDRO PROJECT– ECO POWER (PVT) LTD

Supplied and installed 01 No. Turgo type turbine having a capacity of 2.73 MW from our principals M/s Wasserkraft Volk AG of Germany. – 2.7 MW

Also carried out the complete erection of the Penstock over a length of 1200 m, Diameters ranging from 800 to 1200 mm.